Construction starting soon to build a raised median on George Bush between Wellborn and Texas
![Construction starting soon to build a raised median on George Bush between Wellborn and Texas](https://d3wo5wojvuv7l.cloudfront.net/t_square_limited_480/images.spreaker.com/original/d3422df064cb7c7282c3fa42bcab9b6e.jpg)
Sign up for free
Listen to this episode and many more. Enjoy the best podcasts on Spreaker!
Download and listen anywhere
Download your favorite episodes and enjoy them, wherever you are! Sign up or log in now to access offline listening.
Description
This podcast contains comments from Doug Marino of the Bryan TxDOT district office and College Station city councilman John Crompton during the council's September 24, 2020 meeting. Before the end...
show moreBefore the end of the year, traffic on George Bush Drive between Texas and Wellborn will experience more congestion with the construction of a raised median.
During the last College Station city council meeting, TxDOT Bryan district engineer Doug Marino told councilman and bicyclist John Crompton that the $2 million dollar project will not include a bicycle lane with a barrier.
Marino says the median is the result of too many crashes due to vehicles making left turns to and from George Bush.
Marino told Crompton a separate bike lane is possible in the future if Texas A&M provides the right of way.
Information
Author | Bryan Broadcasting |
Organization | Bryan Broadcasting |
Website | - |
Tags |
-
|
Copyright 2024 - Spreaker Inc. an iHeartMedia Company